20 Sept 2019

Structure in Building Construction

A complete guide for Structure in Building Construction 

It is delightful to see a vacant plot transform into a beautiful home. Do you realize that it requires a good amount of building materials, hours of hard labor, and insights of experts to erect a building? And, a majority of this work is termed as Structure in Building Construction!

In this guide let us learn in detail about how a building is constructed in a vacant plot. We’ll cover the following topics:

Definition & types of structure in building construction.

The steps involved in creating the structure

Precautions while doing structures

What to do after structures?

What exactly is “Structure” in Building Construction?

Structure in building construction refers to the process of putting together different elements of construction, to serve a useful purpose. This method has to effectively support and transmit possible loads on the building to the ground. Due importance is given on each element (also called as structure member), so as to restrict the load stress within the permissible limits.

Depending on how the load is transferred to the ground, the structure can be broadly classified into the following categories:

Types of Structures

a. Load Bearing Structures:

A thick wall structure (mostly built with strong bricks or stones) carries the building load to the ground.

b. Frame Structures:

A frame structure stands on a strong framework – made of concrete beams, columns, and vertical slabs. The columns carry the weight of the building to the ground. The inside of the frame is further filled with block works.

c. Post and Lintel Structures (or pillar beam structure):

A post and lintel structure has two posts like vertical members, holding a horizontal member called lintel, to carry the building load. This is similar to the Frame structure and is predominantly used in high rises and apartments.

As the first step to structures, decide upon the type of structure to be adopted – load bearing, pillar beam or frame.

Next, let us see the different stages of assembling the structural elements in a building construction.

1. Prerequisites for structure in building construction

Much before the actual building construction work commences, some basic site work is done. It includes:

Piling – In case of loose soil, strengthen it with reinforcements by Piling.

Develop Floor Plan -Get a floor plan to understand how the building looks from inside. It gives a fair idea about the layout of the rooms and amount of space available for each utility.

Foundation – Build a proper foundation to support and transfer the entire load from the building to soil.

Elevation – To get the vertical view of the building, draw an elevation plan. Typically, it is four elevation plans, one for each side of the building. This gives a detailed information about the location of exterior wall corners, position of windows and doors, finished floor and ceiling levels, and roof specifications.

Get even more insights about each of these topics here.

FLOOR PLAN


ELEVATION

2: Do Block-work

Block work pertains to erecting walls of the building. Choose from different types of blocks based on the structure type adopted for construction.  The common ones are bricks, concrete blocks, AAC, cement blocks, porotherm etc.

3: Install door and window frames

 Install door and window frames along with progressing block work.

4: Carry out Plumbing and Electrical works

Lay pipes and leave provisions for water usage and drainage as plumbing basics. Also, install electrical conduits and pipes for sealed wiring catering to electrical needs. These also happen along with the block work.

5: Cast Lintel

A lintel is a concrete beam above window and door frames. It offers support to the wall over doors, windows or any other opening.

6: Slab casting, Shuttering, and Concreting

Mark slab requirement in places like the kitchen. Provide support to hold concrete when poured, using shuttering. Lay criss-cross steel reinforcements (RCC) over the shuttering to strengthen concrete. Pour concrete mix over this and allow it to set evenly. Ensure strength of concrete by treating it with water through a process called curing.

The process of casting concrete roof is also similar. In case of a thatched roof, work on the slope of the roof and install roofing materials. Also make sure the joints are sealed properly to avoid leakage in future.

7: Do Plastering

Cover walls with cement and sand mixture for aesthetic appeal called plastering. Prior to this, efficiently route electrical wires and plumbing channels to avoid rework.

Well, that sums up the essentials of structure work in building construction. There are a few tips to consider while doing the structures.

What should you take care of while doing the structure?

Understand that construction of a building is a collaborative effort. Many a thing go hand in hand with structures. To avoid unnecessary delays, plan everything in advance.

Firstly, never miss any of the processes in structure, be it piling. It may seem a bit unnecessary to go through each and every process, but it will prove worthwhile in future. 

Discuss every requirement and choices with the architect before floor plan is finalized. This ensures smooth structure operations.

Visualize your life in your new home before finalizing on the floor plan. Think of where you would be having your morning tea, where you would be entertaining your guests, where your children would be doing their homework or where you would be spending some undisturbed time with yourself.

Wherever there is a choice in building material, do a thorough research beforehand. Finalize it within the stipulated time after taking advice from the engineer. This gives the contractor ample time to be ready with the materials. This holds extremely true for door and window frames, as well as roofing materials.

Cost is an important factor while deciding on building materials, but keep in mind that cheapest is not always the best. For example, never compromise in the case of electrical wiring or concrete to cement ratio. Always go for the recommended options even at a cost of a few extra rupees.

From a utility perspective, have a clear picture on your requirements with respect to plumbing and electric works. Pass on these inputs to the teams concerned before the start of their work.

It is a common misconception that interiors are to be done after the structure is completed. You should have a clear picture of the interiors at the same time as conceptualizing the structure. This will help you make a few structural modifications to enhance the utility of the completed home.

When in doubt, trust the building company’s advice. They are definitely more experienced than you are and will recommend only the best for you.


TRIO VISION CONSTRUCTION COMPANY (Trio vision Group)


CHECKLIST FOR CONCRETE SLAB WHILE CASTING



CHECKLIST FOR CONCRETE SLAB:

The Checklist For Concrete Slab are listed below:

1. Make sure that the cover blocks are at right position and stay okay while concreting.

2. If the concrete is prepared at site, carefully handle the process of batching, water content, mixing and testing of fresh concrete.

3. Ensure that the beams are primarily cast in layers and compacted properly by vibrators.

4. Make sure that one carpenter and one helper is always present under the shuttering slab to confirm that it is supported well and will stay constant during and after concreting.

5. Assure the presence of a bar bender to avoid displacement of steel reinforcement.

6. Never permit extremely smooth finishing for the concrete slabs.

7. Try not to permit sprinkling of dry cement during finishing, It will help to prevent micro shrinkage cracks in the concrete.

8. Put the chairs appropriately to avoid disturbance at the top reinforcement bars during concreting.

9. Try to prevent cold joints in the casting slab.

10. In case of concreting in hot weather, protect the concrete surface by covering with wet gunny bags at least for 4 – 5 hours.

11. In case of concreting in rainy, windy, or extremely hot weather, put a cover of tarpaulin over the slab. It will protect the slab from getting damaged.

12. To prevent plastic shrinkage cracks in the concrete slab, avoid drastic drying of green concrete.

13. Ensure full compaction and complete finishing of the concrete.

18 Sept 2019

Difference Between Foundation And Footing

Foundation
In Civil Engineering, a foundation is the lower portion of a building structure that transfers the building’s gravity load into the earth. A strong foundation is required in order for a building to stand the test of time and survive for decades or even centuries. Foundations are commonly separated into two distict categories: shallow foundations and deep foundations. A building’s foundation is made by first digging a trench into the ground. Dig deep enough to reach the subsoil. Subsoil is more solid than topsoil, which is where plant roots grow. Concrete is then poured into the trench, supported and strengthened further with steel rods. When the concrete dries, the steel holds it all together. This is known as reinforced concrete, and once it is in place, the structure can be built on top.
Footing
In Civil Engineering, a footing is a foundation that is constructed under the base of a wall or a column. The purpose of the footing is to distribute the weight of the building over a large area. The term footing is generally used in conjunction with shallow foundations, not deep foundations. Footing is placed directly below the lowest part of the structure it supports.
Footing vs Foundation
Followings are the differences between Footing and Foundation
Footing                  Foundation
1. The footing is a formation which is in contact with the ground.
Foundation is a structure which transfers its gravity loads to earth from superstructure.
2. Footing can be analogized with the feet of the leg.
Foundation can be compared with legs.
3. The footing is a type of shallow foundation.
Foundation can be shallow and deep.
4.Footing includes slab, rebar which are fabricated of brickwork, masonry or concrete.
Foundation types include piles, caissons, footings, piers, the lateral supports, and anchors.
5.Footing reinforces support to an individual column.
Foundation is an extensive support  because it gives support to a group of footings as an entire building
6. A number of footings repose on a foundation.
Foundation is the support that bears all kinds of loadings.
7. A footing is under the foundation wall.
Foundations are the basement walls.
8. Footing transmits loads directly to the soil.
Foundation is in direct contact with the soil and transmits it to the ground.
9. All footings are foundations.Not all foundations are footings.

15 Sept 2019

Home Loan: कैसे कम करें होम लोन EMI का बोझ, ये टिप्स आएंगे आपके काम



नई दिल्ली, बिजनेस डेस्क। मौजूदा दौर में लोन लेकर घर खरीदना आम बात है। होम लोन न सिर्फ हमें अपने घर खरीदने के फैसले को टालने से रोकता है बल्कि यह हमें टैक्स बचाने में भी मदद करता है। कई मर्तबा होम लोन लेने के बाद इसके ईएमआई को चुकाना एक सिरदर्द होता है। लेकिन, इससे जल्दी छुटकारा कैसे मिले यह बड़ा सवाल है। होम लोन लेने वाले अपने होम लोन ईएमआई बोझ को कम करने के लिए कई ऑप्शनल ट्रिक का इस्तेमाल कर सकते हैं। नए लोन लेने वालों के पास विभिन्न बैंकों की तरफ से पेश की जाने वाली दरों की तुलना करने और अधिकतम फायदा लने के ऑप्शन हैं, लेकिन मौजूदा ग्राहकों के पास बहुत कम ऑप्शन हैं। जिन लोगों ने पहले से लोन लिया है वो अपने होम लोन को एक बैंक से दूसरे ऐसे बैंक में ट्रांसफर कर सकते हैं, जिससे ब्याज दरों में कमी हो सकती है। हालांकि होम लोन ट्रांसफर करना हर किसी के लिए आसान नहीं है। इस खबर में हम आपको होम लोन को जल्द खत्म करने के कुछ टिप्स बता रहे हैं...


होम लोन बैलेंस ट्रांसफर: होम लोन लेने वाले ज्यादातर लोग लोन की अवधि के बीच दूसरे कर्जदाता के पास जाना पसंद नहीं करते। कर्ज की अवधि के दौरान अगर कभी भी उपयुक्‍त कर्जदाता मिलता है, तो इस बात की सलाह दी जाती है कि होम लोन को ट्रांसफर किया जाए। इन बातों को ध्यान में रखकर आप होम लोन को जल्दी भर सकते हैं।


ईएमआई राशि बढ़ाएं: वेतन पाने वाले उधारकर्ताओं को साल में सैलरी में एक बार हाइक मिलता है। इसलिए अपनी ईएमआई राशि को धीरे-धीरे बढ़ाएं। अगर आप हर साल अपनी ईएमआई राशि बढ़ाते हैं तो लोन पीरियड में कमी आएगी, जिससे आपको कुल बकाया लोन राशि चुकाने में मदद मिलेगी।


वेतन की तारीख: कोशिश करें कि अपनी ईएमआई की तारीख अपनी सैलरी की तारीख के नजदीक रखें, इससे आप ईएमआई भुगतान को लेकर कभी नहीं चूकेंगे। ईएमआई और एसआईपी के पेमेंट के बाद बचे धन के साथ अपने खर्च की योजना बनाएं। चाहें तो यह भी सुनिश्चित कर लें कि बकाया भुगतान के लिए आपके होम लोन पर कोई अतिरिक्त शुल्क तो नहीं लगाया गया है।

TRIO vision Group

TRIO VISION CONSTRUCTION COMPANY LUCKNOW.

B-85 indira nagar, Bhoothnath Metro Station lucknow.


21 Aug 2019

We Make Your Dream Home on a Plot of Land.




If you are dreaming about your ideal home but cannot find time to build it , then call us  We help make your dream home a reality. Trio Vision Construction Company is a house designer and house builder that you can trust and rely on.We are making homes with Material.We have well qualified and experienced Manpower and labors.
Are you building your dream home on a piece of land? From hiring an architect/construction company for planning to cross checking the quality of construction, several factors play a critical role in making the end result a success. 

TRIO vision Group shares important tips to keep in mind while constructing your house on a  plot.



The excitement of building a home is priceless. From constructing it to designing, you have to play an active role to ensure successful construction of  your dream home. It is a long process and requires your constant attention or you could end up paying heavily later. TRIO vision group shares  various architectural and financial aspects that one should keep in mind while building a home.

Know your Budget

Before you start constructing your home, set an estimated budget in your mind. The quality of the work to be done will depend on your overall budget. Make sure that your tentative budget is 20 per cent more than the estimated cost. Keep some funds for interiors and do not spend everything on construction.

Hire an architect

Hiring a good architect or a structural engineer will help you organize things well. Explain him your needs and requirements like  number of family members and rooms required on the basis of which he will make a blueprint. “The architect will study the feasibility of the plot and let you know how much of the plot is usable (built-up area). Do not hesitate in asking how much area is to be left open,” says Suresh Pandey, Director, trio vision group.

Once it is done, the architect will further help you take quotations from contractors. However, it is important to do some online and physical research yourself. Talk to different contractors, explain them your needs, and take an estimate and compare. Do not go by what the architect says. Check if the contractor has a sound reputation and is known for using good quality material. Enquire about his past projects, visit his clients, check their homes, ask them the time taken for completing the project and take their feedback.

Shape of the plot

Shape of the plot have a direct impact on the construction cost. While square plots are most viable for construction, complex shapes require more  per sq ft area and which increases  the cost of construction. Also, if you are constructing a bungalow, it is advisable to check if the plot is vastu-compliant.

Materials used 

Another important thing is to find out about the materials being used. For instance, a contractor constructs a home on a 200 sq yard plot of area for Rs 25 lakh in 6 months using substandard construction material while the other contractor completes the same work for Rs 30 lakh in 5 months using good quality material. In this case, you should always go for the second contractor who is more reliable in terms of using materials even though if it affects your budget a little.

Similarly, cost of building material (such as bricks, cement, stone and sand) and labour varies in different cities. It will be relatively higher in metro cities compared to Tier II and III cities. Make an agreement and take everything on paper. Ask the contractor to include some of the interior work within the total cost of construction.

Standard vs Customised home

The concept of standard homes is slowly being replaced by customised and luxury homes. People are now designing specific portions of their home (removing walls and increasing bathroom space) as per their requirement. However, one should not forget that if we desire to build a customised home, the cost increases instantly despite the same materials being used. Remember, customization should not affect your budget.

Basement and Car Parking 

Basements are expensive to construct because it uses Reinforced Cement Concrete (RCC) Framed Structure. “Modern houses are sort of mixed in terms of design and requirement. Therefore, the trend is to divide the ground floor into two halves – front half should be reserved for car parking and the other half should be made the living room facing the garden.

Sustainable development

The world is moving towards sustainability  and it becomes even more important to use sustainable materials and solar products. As a rule, you have to leave thirty per cent open space in societies. Similarly, you should try to leave atleast twenty per cent open space. Use glass windows instead of walls in the living room so that you can have a serene view of the garden. By using these materials, carbon footprint gets reduced thus, making your home more sustainable to the environment.
Now, let us have a look at some of the financial aspects that you should keep in mind:

Loan

To avail home loan for construction of house on a residential plot, it needs to be in Municipal limits on a legally valid title of freehold/lease hold property or property allotted by government agency such as LDA, AWAS VIKS and etc. Loans are not given only for purchase of plot which they consider will be speculative in nature. There is also a stipulated time period within which the construction need to be completed

Eligibility Criteria 

The eligibility is calculated basis the repaying capacity of the borrowers and the property is funded till eighty five per cent loan-to-value (LTV) of the cost of construction. The borrower has to first invest the margin money of fifteen per cent in the initial construction.

Process

Once the loan is sanctioned as per the eligibility of the customers. The banks will conduct the due diligence in terms of legal and technical checks on the property. Post the legal and technical checks are satisfied the loan amount is disbursed as per the stage of construction. Since the property will be under construction and disbursement will be made in tranches, the borrower will be paying only Pre-EMI till the final amount gets disbursed

Type of plan

The interest rate are easing and would be reducing in the coming years. Thus it would be advisable to go for floating rate of interest rather than locking into fixed rate of interest which will be 150-200 basis point higher than floating rate.

Trio Vision Construction Company
B-85 , Indira Nagar, Near Bhoothnath Market, Lucknow
Contact:+91-8318192212,9058913568

















Facebook Page Link :- m.me/triovisionconstruction

Customise your package
to build your perfect home!

*Rates may vary based on preference.


Customise your home from Material, Interiors, Furnishing to Courtyards or Swimming pools! We cover everything to make the perfect home for you! Get in touch with experts to discuss your ideas and preferences.
Book a free Consultation! 
 PleaseFill Request Quote

House and Building Construction Contractor. If you are dreaming about your ideal home but cannot find time to build it , then call us +91-83...